PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

1) Site Conditions on 1.10.2014.JPG 2) Excavating for Footings C4 - D4.JPG 3) Ice on Site at Footing H1 (3).JPG 4) Inside Formwork for Foundation Wall at Col Line 2.5.JPG 5) Slip Form Prep (2).JPG 6) Fire at Auto Body Shop.JPG 7)Fire at Auto Body Shop (2).JPG 8) Fire at Auto Body Shop (3).JPG
Previous pageNext page 5) Slip Form Prep (2)
5) Slip Form Prep (2)